Rain gauge
Source connection needed
Evidence infrastructure
A physical and digital custody record. Deployment, connection, calibration, and publication are separate states.
Source connection needed
Source connection needed
Archive adapter planned
Commissioning protocol required
Select research-grade meter
AudioMoth + BirdNET later
This is a prototype control surface. Actions are intentionally inert until the backing workflow and permission boundary exist.