Portfolio/Field Intelligence HQ
PROTOTYPE DATA⌘  CommandBV

MONDAY · FIELD SYSTEMS PORTFOLIO

What needs to become true next?

A command surface for instruments, studies, partners, and evidence—not a wall of invented telemetry.

T
Truth mode is enforcedEvery value declares whether it is recorded, derived, modelled, simulated, planned, or an operator report awaiting source verification.
View policy
FIELD / 01ACTIVE BUILD
01

Field Observatory

Weather-event evidence and field operations.

  • Rain gauge deployed
  • Lightning monitor deployed
  • Live adapter pending
Open workspace
AQUA / 02INSTRUMENT REVIEW
02

Aqua Eco

Research-grade water monitoring and watershed studies.

  • Meters under evaluation
  • No field deployment
  • Protocol in design
Open workspace
HABITAT / 03PLANNED
03

Habitat Research

Acoustic, visual, and community biodiversity evidence.

  • BirdNET not connected
  • PTZ cameras planned
  • Timelapse archive exists
Open workspace
Operator queue

Three decisions unlock the next build

View all
01
INSTRUMENT

Choose the first water-quality measurement set

Separate must-have channels from grant-specific additions.

NEXT
02
DATA

Identify rain and lightning source endpoints

Vendor, model, export path, cadence, and historical access.

BLOCKS LIVE
03
DEPLOY

Name the canonical product domain

The demo domain remains a gallery; production gets its own boundary.

READY
Instrument estate

Capability, not theater

Operator-reported · 07 Sep 2026
InstrumentPhysical stateHQ stateTruth class
Rain gaugeDeployedSource connection neededOPERATOR REPORT
Lightning monitorDeployedSource connection neededOPERATOR REPORT
Timelapse camerasAvailableArchive adapter plannedOPERATOR REPORT
Air qualityNot deployedCommissioning protocol requiredPLANNED
Water qualityEvaluatingSelect research-grade meterPLANNED
Bird acousticsNot connectedAudioMoth + BirdNET laterPLANNED