Portfolio/Field Intelligence HQ
PROTOTYPE DATA⌘  CommandBV

MONDAY · FIELD SYSTEMS PORTFOLIO

What needs to become true next?

A command surface for instruments, studies, partners, and evidence—not a wall of invented telemetry.

T
Truth mode is enforcedEvery value declares whether it is recorded, derived, modelled, simulated, planned, or an operator report awaiting source verification.
View policy
FIELD / 01ACTIVE BUILD
01

Field Observatory

Weather-event evidence and field operations.

  • Rain gauge deployed
  • Lightning monitor deployed
  • Live adapter pending
Open workspace ↗
AQUA / 02INSTRUMENT REVIEW
02

Aqua Eco

Research-grade water monitoring and watershed studies.

  • Meters under evaluation
  • No field deployment
  • Protocol in design
Open workspace ↗
HABITAT / 03PLANNED
03

Habitat Research

Acoustic, visual, and community biodiversity evidence.

  • BirdNET not connected
  • PTZ cameras planned
  • Timelapse archive exists
Open workspace ↗
Operator queue

Three decisions unlock the next build

View all
01
INSTRUMENT

Choose the first water-quality measurement set

Separate must-have channels from grant-specific additions.

NEXT→
02
DATA

Identify rain and lightning source endpoints

Vendor, model, export path, cadence, and historical access.

BLOCKS LIVE→
03
DEPLOY

Name the canonical product domain

The demo domain remains a gallery; production gets its own boundary.

READY→
Instrument estate

Capability, not theater

Operator-reported · 07 Sep 2026
InstrumentPhysical stateHQ stateTruth class
Rain gaugeDeployedSource connection neededOPERATOR REPORT
Lightning monitorDeployedSource connection neededOPERATOR REPORT
Timelapse camerasAvailableArchive adapter plannedOPERATOR REPORT
Air qualityNot deployedCommissioning protocol requiredPLANNED
Water qualityEvaluatingSelect research-grade meterPLANNED
Bird acousticsNot connectedAudioMoth + BirdNET laterPLANNED